Call us @ 561 - 427 - 3567
Jupiter US-1 Bridge (FDOT) — Government & Infrastructure case study by Wavelength

Jupiter US-1 Bridge (FDOT)

Government & Infrastructure

Documenting a public infrastructure project from the air, frame by frame.

Services
Aerial/Drone · Video · Photo · Timelapse
Location
Jupiter, FL
Engagement
Long-running project

Overview

For the Florida Department of Transportation’s US-1 / Jupiter bridge work, Wavelength provided ongoing construction documentation — a different discipline from brand work, requiring consistency over a long timeline.

What We Did

We captured the project with aerial and drone coverage, long-form construction timelapse, and photography, returning over time to build a complete visual record of progress. Infrastructure documentation rewards reliability and repeatable framing, so the timelapse and aerials line up across months of work. The same capability supported related FDOT North and South Palm Beach projects.

Deliverables

  • Aerial / drone coverage
  • Construction timelapse
  • Progress photography
  • Ongoing documentation

Highlights

  • Multi-month public-infrastructure documentation
  • An aerial and timelapse record of construction progress
  • Government and FDOT project experience